Construction of Joe's Cook Shack / Phase 6

 376 Views
In General

Operations completed:

*Installing the metal roof and flashing

*finish the final grading inside and out

*Placing crushed rock inside the cook shack

*Building terraced stairs going up to the fire pit

*Finished building the walls

*Finished building the counter tops

*Installing lights inside the Cook Shack

*Working on general clean up

*Building the grouting in the stones for the fire pit

*Installing a 3'-0" door in the main Ranger's Cabin

*Installing 3 - 10' long gutters above each door