Operations completed:
*Installing the metal roof and flashing
*finish the final grading inside and out
*Placing crushed rock inside the cook shack
*Building terraced stairs going up to the fire pit
*Finished building the walls
*Finished building the counter tops
*Installing lights inside the Cook Shack
*Working on general clean up
*Building the grouting in the stones for the fire pit
*Installing a 3'-0" door in the main Ranger's Cabin
*Installing 3 - 10' long gutters above each door